Site AssessmentGeneral Within the scope of the site assessment, records of the conditions prevailing at the installation site shall be checked for plausibility. This includes the features listed in the following sections. Additional conditions that are necessary to be considered and are not listed in these sections should also be stated. Locations at which special events, e.g. cyclones and floodings, may be expected shall be considered in consultation with GL Wind.
Furthermore, in the case of confirmation of an existing certificate, a comparison shall be undertaken with the conditions assumed during the certification. Determination of the wind conditionsThe basic parameters listed below for the wind at the turbine site shall be determined:
The wind conditions can be determined at the intended site by measurements. The site conditions shall be correlated with long-term records of local meteorological stations. Determination of other environmental conditionsThe environmental conditions shall be determined for the comparison with the assumptions made in the design of the wind turbine. Determination of the electrical power network conditionsThe electrical conditions shall be determined at the grid connection point between the wind turbine and the existing electrical grid at the intended site, in order to ensure compatibility between the turbine and, where necessary, all electrical equipment located between the turbine and the grid. This shall include the following items at least:
Site specific support structure (tower, substructure and foundation)The support structure carries the machinery part of the wind turbine and consists of tower, substructure and foundation. The assessment of the support structure is performed on the basis of the site specific load assumptions, which were assessed before. The following tasks are to be solved:
Verifications of the ultimate and fatigue strengths are to be carried out for all load carrying structures and connections (welded connections, bolted connections and grouted connections). For the soil the general bearing capacity, base failure and in some cases dynamic-cyclic strength and deformations are to be verified. Assessment of the foundation / soil propertiesThe foundation (soil properties) at the intended site shall be assessed in accordance with the local situation (subsoil, building codes) by a geotechnical report as a rule. Contact
|
|||||||||||||||||||||||||||||||||||||||||||||